The Hubs is making progress on our master Bedroom/Bathroom makeover. This time around, aka: phase 1, we are removing all the old { really old! } wallpaper in both the bedroom and bathroom, making repairs to the skylight drywall, replacing the outdated fixtures, changing the bathroom flooring, replacing all base molding and adding crown molding to bedroom. Phase 2 will be a complete bathroom remodel. It will include an entirely new floor plan with new tub, shower, cabinets, closets and floor so this will be a nice temporary fix until we decide on the new design.
The drywall around the skylight has been replaced and he has also patched and textured the walls in both rooms.
The ceilings have been painted and the walls have a base coat of paint which makes everything look very bright and clean.
The bathroom floor is currently in progress.
The original floor was linoleum which he replaced years ago with hardwood so he could practice before changing our kitchen to hardwood floors. Now he has removed the hardwood and is replacing it with a tile floor.
The crown molding is up however I have not taken a photo of it since it has been painted. The fresh paint looks amazing and will look even better once the walls are painted too. So now comes the hard part...
Choosing paint colors!
The plan is to choose the wall colors by Monday so that painting is finished by Wednesday. The pressure it on. By next weekend I hope to also have the light fixtures chosen as well as bedding and lamps and will try to take plenty of photos to share.
Happy Saturday!
Hope you are finding all the bedding and accessories you need and like. :)