Measure, Cut, Adjust, Finish, Install, Repeat
Our current DIY Home Update continues with our focus now on stairs.
Out with the old and in with the new!
June 10
Mr. Wonderful had to cut the treads to fit the stairs so he made templates to get the angles accurate and try to avoid mistakes that can waste time and money.
June 14
He also needed to place the newel posts which required a hole in two of the treads. Careful measurements were key.
June 14
All the old balisters were removed at this point to make way for the new ones.
June 14
The finished treads were placed in order along the wall.
June 14
Old treads were removed.
June 15
The new treads are installed and attached to the risers. Adjustments are made as needed.
June 16
To install the Newel Post a hole was carefully cut in two of the new treads. Once it was just the right height and snug in the hole it was screwed into the stair stringers.
June 16
Once the newel posts were secure the remaining stair treads were installed.
June 17
June 17
It looked great and the plan was coming together. In fact, we were so excited we could hardly wait to get the hand rail installed however there was still quite a bit to do before the carpet arrived so we put the temporary one back up to keep the workers safe.
June 17
On June 18 the two of us moved all of the upstairs furniture to the hubs Office, my Sewing/Craft Room and our Master Bathroom. We were exhausted however we completed the task. The next morning we moved the bed just before the crew arrived. We love when a plan comes together!
June 19 ~ Carpet Installation!
Stay Tuned for more about our 2024 Home Improvement Project!