Dust has been flying around here as more cabinets have been under way for Phase 2 of P&B’s Kitchen Renovation. This time around it was all about the upper cabinets. The old cabinets were most likely the originals and had seen better days. They also were very small and did not make use of all the available wall space so Mr. Wonderful designed the new cabinets with that in mind.
He decided the best course of action was to remove the soffit on the far wall so he could take advantage of that space as well as the unused space above the old cabinets on the adjoining wall. That allowed him to increase the height of the new cabinets which in turn would provide more storage space. To keep on schedule he went over to the house a couple days before installation to remove the old upper cabinets and the soffit which really helped in the long run.
He’s a man with a plan so he wasted no time and started right in on the uppers as soon as he had Phase 1 completed. He had the boxes built in no time.
Then back to the paint booth.
Doors and shelves were next.
Finally, the drawer slides and hinges were added.
Once they were all adjusted it was time to pack up and head over to install the new upper cabinets. Since there is so much to share I thought it would work better to do it in two posts so I will be back soon with the installation details of phase 2 and how the new cabinets are transforming P&B’s kitchen.
Have a Great Day!
No comments:
Post a Comment