Thursday, March 17, 2022

——— P&B’s Extreme House Makeover ——— .....Kitchen Renovation :: phase 2 :: continued.....

As promised, I am back to share the rest of Phase 2 of P&B’s Kitchen Renovation which was the installation of their new custom made upper cabinets. The last post covered the construction of the upper cabinets and the prep work needed in the kitchen ahead of installation. Once the soffit, cabinets and hood of the stove were all removed it was time to put up the next set of cabinets.
The cabinet pictured above was installed above the stove and will eventually have the hood underneath once the new range is installed. It is a nice sized cabinet although the venting will take up much of space inside. 
The cabinet on the interior wall is the largest upper unit. It has double doors on the section next to the doorway and the other end next to the wall is a single cupboard with one door. It will be a bit more difficult to reach but all storage space is considered premium.
In comparison to the old original cabinet, as seen on the left, the new version is both taller and wider. 
Next, the upper cabinets along the outside wall were hung. 
Crown molding was added at the top of the uppers and will also be added this week along the top of the Phase 1 cabinets on the opposite side of the kitchen. 
Progress is being made little by little. Once the appliances arrive it will be time for Phase 3 of P&B's Kitchen Renovation which will include installation of the lower cabinets and also some new lighting. In the meantime, more cabinets are under way back at the shop so that they are ready to go when everything gets here.

🍀 Happy St. Patricks Day!🍀

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...