Saturday, January 30, 2016

J & C's Kitchen Makeover ~ PART 6: Tile & Flooring

Our DIY Kitchen Makeover
is in the
home stretch!
This past week was spent finishing up the tiling.
The floors, which look like wood planks, are actually ceramic tiles so, needless to say, there was a lot of grout work required between both the back splash and the floor. 
The flooring extends into the breakfast nook and also down the hall leading to the garage and in the downstairs bathroom.  
It's beginning to take shape! 
This weekend the grout will be sealed and once it is dry the appliances can be moved back in place. 
The doors to the upper cabinets will also be added this weekend and hopefully the door knobs and drawer pulls although J & C are having a hard time finding exactly what they are looking for. Once they decide on the hardware though it won't take long to add.

There is one upper cabinet currently under construction which will have glass doors and shelves. It will go on the wall above the stand alone cabinet between the doorways. 

To see J & C's Kitchen Makeover from the start go here.

Have a great Saturday!

1 comment:

  1. You can hardly tell it is the same room!! Absolutely gorgeous...............

    ReplyDelete