Pages

Saturday, May 21, 2011

patio progress

The tiling is finished!


The pile of dirt under the blue tarp had to be removed and the lawn repaired. 

Before Turf


After Turf


 More turf is needed once the walkway is finished. 


After moving irrigation lines and raising the irrigation box the walkway to the front is started and more turf is added.


The patio still needs to be sealed, gutters added to the roof and then wiring for lights so the ceiling can be installed but we are already enjoying our new covered space. 

Also, the answer for Tuesday's question, "how many buttons?" , is 471!

4 comments:

  1. I'm amazed at how much is done in the back yard! Looks wonderful. The stone you are using for the walk is one of my favorite patterns. Great job!!

    ReplyDelete
  2. Thanks. The next time you're over we'll sit on the new patio and have some iced tea!

    ReplyDelete
  3. Jennifer please tell Mr. Wonderful that I am amazed at the splendid job he has done with that back patio. Also, Mr. Wonderful installed the last most important part of the sewing room cabintry for his mother-in-law. It is so big she can sleep on it at night.
    Dad

    ReplyDelete